Kids First Sports Center

Using the Ohio PACE program for funding

THE CHALLENGE

Outdated systems with high costs

Built in 1998, Kids First Sports Center is an 108,000-square foot multi-use facility with gymnastics, cheer, basketball, and swimming areas. In addition, the facility has a restaurant, a pre-school, and specialty retail shop.

Updating the lighting and insuring the mechanical system was operating at peak performance was important. Being a good steward of the environment was an important aspect of the owner’s philosophy, and finding the right financial partner to facilitate building improvements was critical.

It is home to the prestigious Queen City Gymnastics club, founded in 1975 by owner Jeff Metzger, an industry pioneer. Since 1991, Jeff has hosted his nationally acclaimed “Boot Camp” at Kids First, a three-day leadership and marketing seminar for Sports Facility leaders attending from all over the world. Over the past decade as the facility was expanded and daily traffic increased, ownership sought to keep operating costs down while improving the guest experience.

THE SOLUTION

40% Improved Lighting

Kids First selected NEC to perform a building audit and energy use analysis in 2005. The audit has been updated regularly as the building has changed in size and utilization. Taking advantage of Duke Energy Smart Saver Program, Federal and State incentives, and using the Ohio PACE program for funding in 2017, building lighting has been upgraded twice, from HID to Fluorescent in 2005, then from Fluorescent to LED in 2017.

A rooftop Solar PV array of 100 KW was installed in 2012, and a second array of 150 KW was added in 2017.

  1. Upgraded lighting from NEC improved light levels while lowering energy costs.
  2. Intelligent controls maximized AC system and reduced demand.
  3. Installation of surge suppression system cleaned up facility power.
  4. Implementation of 100 kw solar array provided clean energy power plant and paid for roof replacement.